BEFORE

I Need More Room Problem

Incomplete House Problem

Click here to see full project details

The look of a partially constructed house did not appeal to the new owner. The garage below allowed water into the lower level. The interior design did not meet new owner's style need for space.

AFTER

I Need More Room Problem

BEFORE

I Need More Room Problem

Small Room Problem

Click here to see full project details

The living room was dark and narrow. More storage and display area was needed for books and knick knacks.

AFTER

I Need More Room Problem

BEFORE

I Need More Room Problem

I Need More Space Problem

Click here to see full project details

The house was built at a time when rooms were smaller. The kitchen was too dark. The deck was so small there was only room for two chairs.

AFTER

I Need More Room Problem

BEFORE

Cosmetic Condo Renovation

Click here to see full project details

This 3-story Condo in Newington, CT underwent some cosmetic renovations to the basement, Living Room, Bedrooms, and Bathrooms.

AFTER

BEFORE

Open Floor Plan

Click here to see full project details

The Homeowner being a mother of four young children, wanted to take down two walls between Dining Room and Kitchen and between Dining Room and Living Room so that she could keep an eye on her kids while cooking.

AFTER

BEFORE

Dysfunctional Kitchen With No Cabinet Space

Click here to see full project details

Some older homes have dark, small rooms and poor traffic flow. Sometimes, this problem can be solved simply, while in other instances, it involves more extensive renovations. Here are two projects illustrating both scenarios.

AFTER

BEFORE

Bathroom Remodel

Click here to see full project details

space planning (moving walls, reconfiguring layouts, positioning appliances and fixtures), and working with the Contractor to resolve unforeseen changes to the design.

AFTER

BEFORE

Basement Remodel

Click here to see full project details

Almost any Finish Basement project requires careful and detailed space planning. The challenge is that we have to work around existing oil tanks, water heaters and plumbing systems, pipe lines and electrical wiring.

AFTER